Ntp-B227 Provision An Integrated Path Protection Dual Ring Interconnect - Cisco ONS 15327 Procedure Manual

Hide thumbs Also See for ONS 15327:
Table of Contents

Advertisement

Chapter 4
Turn Up Network
NTP-B227 Provision an Integrated Path Protection Dual Ring
Interconnect
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Step 1
Complete the
Step 2.
Step 2
Complete the following steps if you have not provisioned the path protection that you will interconnect
in a path protection DRI. If the path protection are created, go to Step 3.
Note
a.
b.
Step 3
Verify that the path protection DRI interconnect nodes have OC-N cards installed and have fiber
connections to the other interconnect node:
March 2003
This procedure provisions path protection in an integrated dual ring
interconnect (DRI) topology. In the integrated DRI, the path protection
OC-N trunk cards for both path protection are installed on the same shelf.
None
NTP-B35 Verify Node Turn Up, page 4-2
As needed
Onsite
Provisioning or higher
"DLP-B60 Log into CTC" task on page
All path protection that will be interconnected must be at the same OC-N rate.
Complete the
"NTP-B44 Provision Path Protection Nodes" procedure on page 4-23
path protection.
Complete the
"NTP-B177 Path Protection Acceptance Test" procedure on page 4-24
protection.
The OC-N cards that will connect the path protection must be installed at the interconnect nodes.
The OC-N cards in the path protection nodes and the interconnect nodes must be the same type.
The interconnect nodes must have the correct fiber connections. An example is shown in
on page
4-28. This example shows a path protection DRI with two rings, Nodes 1 through 4 and 5
through 8. In the example, an additional OC-N is installed in Slot 4 at Node 4 and connected to an
OC-N in Slot 2 at Node 6. Nodes 3 and 5 are interconnected with OC-N cards in Slot 2 (Node 3) and
Slot 4 (Node 5).

NTP-B227 Provision an Integrated Path Protection Dual Ring Interconnect

2-23. If you are already logged in, continue with
Cisco ONS 15327 Procedure Guide, R4.0
to provision the
to test the path
Figure 4-5
4-29

Advertisement

Table of Contents
loading