Figure 1-1 Reversing The Mounting Brackets (23-Inch Position To 19-Inch Position) - Cisco ONS 15327 Procedure Manual

Hide thumbs Also See for ONS 15327:
Table of Contents

Advertisement

Chapter 1
Install Hardware
When mounting the ONS 15327 in a frame with a non-conductive coating (such as paint, lacquer, or
Caution
enamel) use the thread-forming screws provided with the ONS 15327 shipping kit or remove the coating
from the threads to ensure electrical continuity.
Step 1
Remove the screws that attach the mounting bracket to the side of the shelf assembly.
Flip the detached mounting bracket upside down.
Step 2
Text imprinted on the mounting bracket will now also be upside down.
Place the widest side of the mounting bracket flush against the shelf assembly (see
Step 3
The narrow side of the mounting bracket should be towards the front of the shelf assembly. Text
imprinted on the mounting bracket should be visible and upside down.
Align the mounting bracket screw holes against the shelf assembly screw holes.
Step 4
Insert the screws that were removed in
Step 5
Repeat the task for the mounting bracket on the opposite side.
Step 6
Figure 1-1
Reversing the Mounting Brackets (23-Inch Position to 19-Inch Position)
Front
Top of unit
Rear
19 in. (482.6 mm) position
Front
Top of unit
Rear
23 in. (584.2 mm) position
Step 7
Return to your originating procedure (NTP).
March 2003
Step 1
and tighten them.
Rear
Mounting
L brackets
Mounting
L brackets
NTP-B2 Install the Shelf Assembly
Figure
Side of unit
23 in. (584.2 mm)
mounting holes
19 in. (482.6 mm)
mounting holes
Cisco ONS 15327 Procedure Guide, R4.0
1-1).
Front
1-7

Advertisement

Table of Contents
loading

Table of Contents