Figure D-1 Opening The Fiber-Optic Cable Storage Drawer; Figure D-2 Locking The Cable Storage Drawer - Cisco ONS 15327 Procedure Manual

Hide thumbs Also See for ONS 15327:
Table of Contents

Advertisement

Appendix D
Alternate Installation Procedures
Figure D-1
Pull out the cable storage drawer.
Step 2
Lock the drawer in the open position by pushing the latch at drawer down into the lock position
Step 3
(Figure
Figure D-2
Route the cable down the left side of the chassis and into the drawer.
Step 4
Continue to route the cable through the drawer around the round cable retainers to the right side.
Step 5
Step 6
Pull the cable up out of the right side of the drawer
Step 7
Repeat Steps
Step 8
Unlock the drawer by moving the latch back into an upright position and close the drawer.
Push the drawer shut until it clicks in place.
Step 9
March 2003
Opening the Fiber-Optic Cable Storage Drawer
D-2).
Locking the Cable Storage Drawer
4
through
6
to continue cabling the system.
NTP-B224 Route Cables Through the Fiber-Optic Cable Storage Drawer
Cisco ONS 15327 Procedure Guide, R4.0
D-3

Advertisement

Table of Contents
loading

Table of Contents