Avaya Definity SI Maintenance Manual page 1098

Table of Contents

Advertisement

Maintenance Object Repair Procedures
Table 10-123. TEST #627 BRI Remote Loop Back — Continued
Error
Code
2069
2100
2000
2071
2072
1000
10-312
Issue 4 May 2002
Test
Result
ABORT
The endpoint has returned an error response to the application
message sent by the switch.
ABORT
Could not allocate the necessary system resources to run this
test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
FAIL
No loop back activation or deactivation response is received
from the endpoint.
1. Consult the endpoint documentation to determine if
ISDN-BRI Management and Maintenance Procedures are
supported. If not supported, use change station
extension command to change the MIMs Supported?
field to "no." Use the busyout station extension and
release station extension commands to busyout and
release the endpoint to resolve any endpoint alarms
resulting from failure of this test.
2. If the endpoint supports these procedures and the test
continues to fail, assume the endpoint is defective and
replace it.
FAIL
No data is detected on Channel B1 during loop back.
FAIL
No data is detected on Channel B2 during loop back.
1. Replace the endpoint and repeat test.
2. If test continues to fail, check the wiring between the
endpoint and the switch and repeat the test.
PASS
The endpoint has responded to the switch activate and
deactivate loop back application messages. Data has been
detected on the looped back channels.
ABORT
Could not seize the endpoint or B-channels for test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
Description/Recommendation
Continued on next page
555-233-123

Advertisement

Table of Contents
loading

Table of Contents