Avaya Definity SI Maintenance Manual page 1217

Table of Contents

Advertisement

CO-DS1 (DS1 CO Trunk)
Port Audit and Update Test (#36)
This test sends port level translation data from switch processor to the DS1
Interface circuit pack to assure that the trunk's translation is correct. Translation
updates include the following data: trunk type (in/out), dial type, timing
parameters, and signaling bits enabled. The port audit operation verifies the
consistency of the current state of trunk kept in the DS1 Interface circuit pack and
in the switch software.
Table 10-161. TEST #36 Port Audit and Update Test
Error
Code
1000
2000
2100
555-233-123
Test
Result
ABORT
Internal System Error.
1. Retry the command at 1-minute intervals a maximum of 5
times.
ABORT
The test was aborted because system resources required to
run this test were not available. The port may be busy with a
valid call. Issue the display port PCSSpp command to
determine the trunk group/member number of the port. Use
the status trunk command to determine the service state of
the port. If the service state indicates that the port is in use,
then the port is unavailable for certain tests. You must wait
until the port is idle before retesting.
1. If the port status is active but the port is not in use (no
calls), check the error log for error type 1025 (see the
error log table for a description of this error and required
actions). The port may be locked up.
2. If the port status is idle, retry the command at 1-minute
intervals for a maximum of 5 times.
ABORT
Response to the test request was not received within the
allowable time period.
ABORT
Could not allocate the necessary system resources to run this
test.
Description/Recommendation
Continued on next page
Issue 4 May 2002
10-431

Advertisement

Table of Contents
loading

Table of Contents