Avaya Definity SI Maintenance Manual page 1297

Table of Contents

Advertisement

DAT-LINE (Data Line)
Audit Update Test (#36)
This audit makes sure that the hardware state of the Data Line is consistent with
the system translations. When this audit is run, the port is queried for the
switchhook state, and the software state is updated according to the returned
value. Also, the data line options are sent down to the port.
Table 10-188. TEST #36 Audit Update Test
Error
Code
1000
1006
2000
2100
7
555-233-123
Test
Result
ABORT
System resources required to run this test are not available.
1. Retry the command at 1-minute intervals for a maximum
of 5 times.
2. Escalate the problem if the test continues to abort.
ABORT
The test did not run due to an already existing error on this
port (Error Type 769).
1. Refer to the procedure for Error Type 769. If Error Type
769 still occurs on this port, replace the circuit pack.
ABORT
Response to the test request was not received within the
allowable time period.
ABORT
Could not allocate the necessary system resources to run this
test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
FAIL
Internal system error
1. Retry the command at 1-minute intervals a maximum of 5
times.
PASS
The hardware port state is consistent with the software state.
User-reported troubles on this port should be investigated
using other port tests, examining the ADU, external wiring,
and customer equipment.
Description/Recommendation
Continued on next page
Issue 4 May 2002
10-511

Advertisement

Table of Contents
loading

Table of Contents