Avaya Definity SI Maintenance Manual page 720

Table of Contents

Advertisement

Maintenance Commands and Trouble-Clearing Aids
Feature Interactions
The maintenance of a particular component on a link may interfere with the
maintenance of the link itself. Maintenance can put a link component in a busy
state causing link set-up to fail. Frequent attempts at re-setup of a link may delay
the recovery of a faulty component due to the maintenance test of a component
only taking place when the component is idle. Therefore, the technician needs to
be able to disable the attempted re-setup of a link. The busyout command is
used to do this and causes the link to be torn down. If the link is already down, the
busyout command stops periodic re-setup tries on the link.
Output
The following example shows the output for the test pms-link long command.
The responses display on a test-by-test basis with one line of data for each test
result.
test pms-link long
Port
Maintenance Name
PMS-LINK
Command Successfully Completed
Field descriptions
Port
Maintenance
Name
Alt. Name
Test No
Result
Error Code
8-470
Issue 4 May 2002
TEST RESULTS
Alt. Name Test No. Result
214
PASS
Always blank
Always PMS-LINK
Not applicable.
The test being executed
Test result: Pass, Abort, Fail, No Board, Disabled, Extra Bd.
Numeric code explaining why the release failed or aborted.
Refer to the list of codes by test number for each MO.
Error Code
555-233-123

Advertisement

Table of Contents
loading

Table of Contents