Mazda 323 1988 Workshop Manual page 580

Mazda 323 1988
Hide thumbs Also See for 323 1988:
Table of Contents

Advertisement

ASSEMBLY
f c;
Bearing Preload
Check
the shaft gears
and the differential
bearing
preload.
Note
a) Check that the correct adjust shims were
selected.
b) If the bearing preload is not within specifi-
cation, adjust again.
1, Set the primary
shaft gear and the center differen-
tial assembly
into the clutch
housing.
2. Install the transaxle
case, and tighten
to the speci-
fied torque.
Tightening
torque:
37-52
N-m
(3.8-5.3
m-kg, 27-38
ft-lb)
3. Connect
the
SST
and
install
it through
the
driveshaft
hole.
4. Hook a spring
scale
to the attachment
and meas-
ure the preload.
Note
Extend the handle fully and hook the pull scale
to the end of the handle.
Preload:
1.4-2.0
N,m
(14-20
cm-kg, 12.2-17.5
In-lb)
5.
Remove
the
SST.
6. Connect
the SST to the primary
shaft gear
7. Check
the primary
shaft preload.
Preload:
0.1 O-O.25
N.m
(1 .O-2.5
cm-kg, 0.87-2.18
in-lb)
8. Remove
the
SST,
transaxle
case,
primary
shaft
gear and center
differential
assembly.
9. Install the secondary
shaft gear and transaxle
case
then tighten
to the specified
torque.
Tightening
torque:
37-52
N.m
(3.8-5.3
m-kg, 27-38
ft-lb)
10. Check the secondary
shaft preload
with the
SST.
Preload:
0.2-0.4
N.m
(2.0-4.0
cm-kg, 1.7-3.5
in-lb)
11, Remove
the
SST,
transaxle
case and secondary
shaft gear.
7c-73

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents