Mazda 323 1988 Workshop Manual page 335

Mazda 323 1988
Hide thumbs Also See for 323 1988:
Table of Contents

Advertisement

TURBOCHARGING
SYSTEM
4B
L
83"04B-11
Pressure switch
(For overbocst detection
2
)
Waste Gate Valve
1. Cool the engine.
2. EW&ve the waste gate actuator hose and attach
3. Adjust the compressed air pressure to 48.1-58.9
kPa (0.49-0.80
kg/cm2, 7.0-8.8
psi).
4. Check that the rod moves when disconnecting and
reconnecting the hose applying the compressed
air.
Caution
Do not apply compressed
air higher than 98
kPa (1.0 kg/cm',
14 psi).
Pressure Switch
1. Turn the ignition switch ON.
2. Disconnect the hose from the pressure switch and
attach SST.
3. Adjust the compressed air pressure to 71.8-79.8
kPa (0.73-0.81
kg/cm*,
10.4-l
1.8 psi).
4. Make sure that the warning buzzer sounds while
applying the compressed air.
5. If the warning buzzer does not sound, inspect as
described below.
Inspection
of voltage
1. Turn the ignition switch ON.
2. Apply air pressure of 71.8-79.8kPa
(0.73-0.81
kg/cm*, 10.4-11.8
psi) to the pressure switch,
then check the voltage at the (Lg),and (B) termi-
nals with the connector connected.
Condition
I
L!2
I
B
Compressed
air applied
(
12v
/
ov
Compressed
air not applied
/
ov
I
ov
If the voltage is not correct, go to next step
lnspectlon
of the pressure
switch
1. Turn the ignition switch OFF.
2. Disconnect the pressure switch connector.
3. Apply air pressure of 71.8-79.8
kPa (0.73-0.81
kg/cm', 10.4-l
1.8 psi) to the pressure switch,
then check the continuity between the terminals.
Condition
I
Continuity
Compressed
air applied
Yes
Compressed
air not applied
I
No
If the continuity is not good, replace the pressure
switch.
323
Revised 10187
48-63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents