Valve - Mazda 323 1988 Workshop Manual

Mazda 323 1988
Hide thumbs Also See for 323 1988:
Table of Contents

Advertisement

EVAPORATIVE
EMISSION
CONTROL
SYSTEM
4B
L
r
NO.lPURGE
CONTROLVALVE
Inspection
1. Blow through
the purge control
valve from port (A)
and check
that air does not flow.
2. Connect
a vacuum
oumo
to the ourae
control
-
valve.
3. Apply 110 mmHg
(4.33 inHg)
vacuum,
and blow
through port (A) again; air should flow from port (A).
NO. 2 PURGE
CONTROL
VALVE
Inspection
1. Disconnect
vacuum
hose (B) from the evaporation
pipe.
2. Blow into the hose and check that air flows freely.
SOLENOID
VALVE
1. Disconnect
vacuum
hose (A) from the servo
di-
aphragm.
2. Disconnect
vacuum
hose (B) from the solenoid
valve.
3. Disconnect
the connector
of the solenoid
valve.
4. Blow air through
the solenoid
valve from hose (A)
and make
sure air comes
out of port (C).
5. Apply
battery
power to the solenoid
valve with a
suitable
jumper
wire.
6. Blow air through
the solenoid
valve from hose (A)
and check
that air comes
out of port (B).
7. If the solenoid
valve does not operate
properly,
re-
place it with a new one.
48-69

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents