VLT® Servo Drive System ISD 510/DSD 510
Operating Guide
7.
Carry out a power cycle to ensure that all ID changes are in effect and operational on the fieldbus.
6.4.2.2 Setting the Node ID for a Single Servo Drive via the Power Supply Module (PSM 510) or De-
central Access Module (DAM 510) via the LCP
It is also possible to change the Node ID of a servo drive when the LCP is connected to the PSM 510 or DAM 510. This functionality is
contained in parameter group 54-** ID Assignment in subgroup 54-1* Manual.
Procedure
1.
Attach the LCP to the PSM 510/DAM 510 that is connected to the servo drives and system modules for which the Node ID
should be changed.
2.
Press the Hand On button for >1 s to make the LCP the controlling interface for the PSM 510/DAM 510.
3.
Press the Main Menu button then scroll down to submenu 12-** Ethernet and press OK.
4.
Scroll down to submenu 12-6* Ethernet POWERLINK and press OK.
5.
Change the PSM 510/DAM 510 node ID to the desired value (1–239) by pressing the OK button.
6.
Return to the Main Menu and select parameter 54-** ID Assignment.
7.
Select parameter 54-1* Manual.
8.
PSM 510 only: In parameter 54-01 Epl id assignment line, select either Ethernet port X1 or X2. The PSM 510 will assign IDs to
the selected device via the selected port and the fieldbus network. On DAM 510 port, X2 will be used automatically.
9.
Select parameter 54-12 Epl ID assignment start id then select a valid value (1–239). The value will be assigned to the device at
the specified position index. The PSM 510/DAM 510 connected to the LCP is at position 0 and the 1st reachable device on
the selected port is position index 1 and so on.
10.
Select parameter 54-14 Manual Epl ID assignment start and change the status from [0] ready to [1] start.
11.
Press OK to confirm the selection then wait for the ID assignment procedure to complete.
12.
Check that the ID assignment was completed successfully using parameters:
a.
Parameter 54-15 Epl ID assignment state
b.
Parameter 54-16 Epl ID assignment error code
c.
Parameter 54-17 Epl ID assignment device count
13.
Carry out a power cycle to ensure that all ID changes are in effect and operational on the fieldbus.
If an error occurs during ID assignment, the detected error is shown on the LCP. The following errors may be reported:
•
Invalid NMT state
•
Invalid comment
•
Invalid Ethernet port
•
Invalid node ID
•
ID assignment failed
•
Duplicate MAC address
•
Invalid SW version
•
Incomplete assignment
•
No device found
•
Internal error
6.4.3 Multiple Device ID Assignment
When assigning IDs to several devices (for example, when setting up a new network), use the VLT
assignment (see the VLT® Servo Drive System ISD 510, DSD 510, MSD 510 (VLT® Flexmotion
information).
Setting the IDs of all the servo drives connected to a Decentral Access Module (DAM 510) or Power Supply Module (PSM 510) at the
same time can also be done via the LCP when it is connected to the DAM 510/PSM 510.
6.4.3.1 Setting the Node IDs of all Servo Drives and System Modules on a Decentral Access Module
(DAM 510)/Power Supply Module (PSM 510) Line
The automatic PSM 510/DAM 510 ID assignment is used for automatically setting the Node IDs on all servo drives and system mod-
ules for a specified PSM 510/DAM 510 line. This functionality is contained in parameter group 54- ** ID Assignment in subgroup 54-0*
Automatic.
84 | Danfoss A/S © 2020.08
Commissioning
Servo Toolbox subtool DAM ID
®
) Programming Guide for further
™
AQ262449648484en-000101 / 175R1135