Assembling The Sections Of The Track Motion Irbt 2005 (Longer Than 9 M) - ABB IRBT 2005 Product Manual

Table of Contents

Advertisement

2.4.5 Assembling the sections of the track motion IRBT 2005 (Longer than 9 m)

Required equipment
Standard tools
Quantity
1
1
1
1
Special tools
Quantity
2
1
1
Product manual - IRBT 2005
3HAC051130-001 Revision: F
2.4.5 Assembling the sections of the track motion IRBT 2005 (Longer than 9 m)
Description
Rack clamps
Leveling tool
Locking nut adjust-
ment tool
© Copyright 2015 - 2018 ABB. All rights reserved.
2 Installation and commissioning
Tool
Ring-open-end spanner 8 - 22 mm
Small flat tip screwdriver
Torque wrench 10 -140 Nm
Ratchet head for torque wrench 1/2"
Art. No.
Illustration
-
3HAC054535-001
3HAC054534-001
Continues on next page
83

Advertisement

Table of Contents
loading

Table of Contents