ABB IRBT 2005 Product Manual page 62

Table of Contents

Advertisement

2 Installation and commissioning
2.3.4.4 Lifting cable chain
Continued
1
2
3
4
Continues on next page
62
Note
For external cable chain, in order to keep the correct length for long chains that
are to be rolled, the strapping plate as well as the first cover and clips are
removed. Refit these parts during installation.
xx1400001938
Action
With the chain lying on its side, secure the loose
end to ensure that the chain can not unroll during
the lift.
Lift the chain so that it is standing upright and in-
sert a wide lifting sling (50 mm) through the center
of the chain.
Lift the cable chain to the installation position
above the cable tray. The chain should be placed
so that both ends are in the middle of the track.
Lower the cable chain into the cable tray. The
ends of the chain should be in the middle of the
track.
© Copyright 2015 - 2018 ABB. All rights reserved.
Illustration/Note
xx1300000888
xx1300000889
Product manual - IRBT 2005
3HAC051130-001 Revision: F

Advertisement

Table of Contents
loading

Table of Contents