2.3.3 Unpacking

Inspection
The track motion IRBT 2005 has been pre-assembled in ABB factory. For delivery
and storage's convenience, it would be divided into several segments as an unit
depending on the length of the track when delivered.
The track IRBT 2005 is wrapped in plastic. Unpack the track and inspect for any
visible transport damage. If the track motion is damaged, contact ABB.
Contents
As standard, the track motion IRBT 2005 includes the following on delivery:
Cleaning
Before transport, the track motion IRBT 2005 has been protected against rust by
a thin film of oil that has been applied before packing.
1
Product manual - IRBT 2005
3HAC051130-001 Revision: F
Track motion IRBT 2005 segments depending on the length
Note
Do not clean any of the pre-lubricated linear guide and rack.
Action
Wipe off any surplus oil using a lint-free
cloth.