2 Installation and commissioning
2.3.4.4 Lifting cable chain
Continued
xx1400000522
Item
A
B
C
D
Plan the job
Cable chains are easily damaged through improper handling. Chains longer than
4 meters are heavy and cumbersome to move. In order to prevent personal injury
and damage to the chain, make sure to pay attention while handling.
Read the procedure thoroughly before installing the chain and plan the job in
advance, in regard to the actual installation site.
To move the chain from storage to track, use one of the methods described in this
section. Method 2 requires an overhead crane.
Required equipment
Equipment
Lifting slings, standard
Lifting sling, extra wide (50 mm)
Overhead crane
Continues on next page
60
Art. No.
-
-
-
© Copyright 2015 - 2018 ABB. All rights reserved.
Description
Cable tray, 1 m
External chain raiser
External tray 1.45 m unit
External tray bracket unit
Note
Quantity depends on track length.
Required if using lifting method 1.
Required if using lifting method 2.
Product manual - IRBT 2005