ABB IRB 4400 - 45 Product Manual page 60

Articulated robot
Table of Contents

Advertisement

2 Installation and commissioning
2.3.3. Orienting and securing the robot
Continued
Hole configuration and dimensions
The illustration below shows the hole configuration and hole dimensions of the robot base,
seen from below.
The cut x-x shows the dimension of the rear bolt holes, where the guide sleeves may be used.
xx0300000252
A
B
Orienting and securing the robot
The procedure below details how to orient and secure the robot to the base plate after fitting
the plate to the foundation.
The manipulator weighs 1300 kg! All lifting equipment used must be dimensioned
accordingly!
58
Rear bolt holes
Center line, axis 1
Action
1. Warning!
When the robot is put down, before attachment to the
floor is done, the risk of tipping is big, if not properly
secured.
2. Lift the robot.
3. Move the robot to the vicinity of the installation site.
4. Fit two guide sleeves to the rear bolt holes in the
base.
5. Guide the robot gently using M20 screws while
lowering it into its mounting position.
Info/Illustration
Detailed in section
Lifting
robot with round slings on
page
48.
Art. no. is specified in
Securing parts/facts on page
57.
Shown in the figure
Hole
configuration and
dimensions on page
58.
Continues on next page
3HAC022032-001 Revision: E

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 4400 - 60Irb 4400 - l10Irb 4400 - l30Irb 4400 - ls

Table of Contents