Combination Switch Inspection - TOHATSU BFT75A Service Manual

4 stroke outboard motor
Hide thumbs Also See for BFT75A:
Table of Contents

Advertisement

dummyhead
dummyhead
Clean the housing and under cover mating surfaces
thoroughly using a shop towel and degreasing cleaning
solvent.
Apply liquid gasket (ThreeBond® #1216E or equivalent)
to the housing in the areas shown.
Install the under cover [1] and six screws [2] and tighten
them to the specified torque.
TORQUE: 2.4 N·m (0.24 kgf·m, 1.8 lbf·ft)
Install the tiller handle (page 19-22).

COMBINATION SWITCH INSPECTION

Check for continuity between the terminals with the
switch in each position.
Position
OFF
ON
START
IG
BAT
Color
E
Black/
White/
Black
Red
Black
: Continuity
9 mm
(0.4 in)
LOAD
ST
Black/
Black/
Yellow
White
CONTROLS
20 mm
(0.8 in)
[1]
[2]
Black/
White
White/
Black
Black/
Yellow
Black
Black/Red
19-45

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bft 90a

Table of Contents