10.
If the amount of PT fluid is insufficient, replenish the PT
fluid to the specified level.
Recommended PT Fluid:
OIL
ATF DEXRON III
11.
Install the reserve tank cap and tighten to the specified
torque.
Reserve Tank Cap:
1.5 N·m (1.1 lb·ft ) [0.15 kgf·m]
12.
Repeat steps 5 through 12 until the PT fluid reaches the
specified level.
27) Inspection of PT Solenoid
1.
Check the resistance values of the PT solenoid (up side)
1 and the PT solenoid (down side) 2. Replace the PT
solenoid if other than the specified value.
Resistance Between Terminals
(Terminal a – Terminal b):
28) Inspection of PT Switch
1.
Check the electrical conductivity of the PT switch. Replace
if other than the specified value.
Lead Wires
Switch Position Sky Blue (Sb)
UP (Tilt Up)
Free
DOWN (Tilt Down)
4st 25/30 2022
Red (R)
Pink (P)
7
7-51