TOHATSU BFT75A Service Manual page 297

4 stroke outboard motor
Hide thumbs Also See for BFT75A:
Table of Contents

Advertisement

dummyhead
dummyhead
STARTING SYSTEM
Remove the packing [1] from the front bracket [2].
Remove the overrunning clutch [1] and clutch fork [2]
from the front bracket [3].
Secure the gear shaft [1] by placing a wood block [2]
under the gear shaft assembly, taking care not to touch
the internal gear [3].
Prepare a pipe [4] of the following dimensions.
• I.D.: approximately 11 mm (0.4 in)
O.D.: approximately 15 mm (0.6 in)
LENGTH: approximately 20 mm (0.8 in)
Set the pipe on the gear shaft stopper [5] and drop the
gear shaft stopper into the overrunning clutch by
tapping on the pipe.
Remove the snap ring [6] using a screwdriver or
equivalent tool.
9-12
[1]
[2]
[4]
[5]
[3]
[6]
[2]
[1]
[2]
[3]
[1]
[5]

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bft 90a

Table of Contents