dummyhead
dummyhead
CONTROLS
Apply thread locking agent (LOCTITE® 242 or
equivalent) to the threads of the two bolt/washers [1].
Install the cable bracket [2] and clamp bracket [3], and
tighten the two bolt/washers to the specified torque.
TORQUE: 7 N·m (0.71 kgf·m, 5.2 lbf·ft)
Set the shift side remote control cable [4] in the handle
cable installation hole in the grommet [5], and set the
throttle side remote control cable [6] in the handle cable
installation hole by viewing the grommet from the
outboard motor side as shown.
Install the grommet on the tiller handle.
• Note that the longer remote control cable is the shift
side cable, while the shorter cable is the throttle side
cable.
Set the shift side and throttle side remote control cables
on the shift frame and the throttle arm respectively, and
install the two E-rings [7] securely.
• Check that the throttle side remote control cable
does not interfere with the power trim/tilt switch
(except LHGX type only).
Set the tiller handle harness [1] through the grommet [2]
with the bands [3] on either side of the grommet.
19-44
[1]
[3]
[5]
Viewing the grommet from the outboard motor side:
[1]
Viewing the grommet from the outboard motor side:
[3]
[1]
[2]
[5]
[4]
[6]
[7]
[4]
[6]
[2]
[2]