Installation - TOHATSU BFT75A Service Manual

4 stroke outboard motor
Hide thumbs Also See for BFT75A:
Table of Contents

Advertisement

dummyhead
dummyhead
PROPELLER REMOVAL/INSTALLATION
(Spline and threads)
PROPELLER THRUST WASHER

INSTALLATION:

Install the thrust washer in the direction as
shown.
GEAR CASE
SIDE
3-BLADE PROPELLER
(Optional part)
PROPELLER
SIDE
WASHER (18.5 mm)
SPLIT PIN (4.0 mm)
INSTALLATION:
Be sure to use a Honda Genuine
part (stainless steel).
Bend the pin ends as shown to
secure the nut.
SPLIT PIN (4.0 mm)
PROPELLER CASTLE NUT (18 mm)
TORQUE:
1 N·m (0.10 kgf·m, 0.7 lbf·ft)
Tighten the castle nut to the specified
torque. If the split pin cannot be set,
tighten the nut additionally until the split
pin can be set.
MAX. TORQUE:
44.1 N·m (4.5 kgf·m, 33 lbf·ft)
GEAR CASE
16-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bft 90a

Table of Contents