TOHATSU BFT75A Service Manual page 317

4 stroke outboard motor
Hide thumbs Also See for BFT75A:
Table of Contents

Advertisement

dummyhead
dummyhead
OTHER ELECTRICAL
Set the starter cable (+) [1] on the B terminal [2] of the
starter motor [3].
Install and tighten the nut [4] to the specified torque
while adjusting the clearance between the starter cable
(+) and the starter motor to 10 – 20 mm (0.4 – 0.8 in) as
shown.
TORQUE: 11 N·m (1.1 kgf·m, 8 lbf·ft)
Install the washer [5] on the starter motor B terminal.
Install the fuse cable [6] on the B terminal.
Hold the fuse cable parallel to the starter cable (+).
Install and tighten the nut [7] to the specified torque.
TORQUE: 11 N·m (1.1 kgf·m, 8 lbf·ft)
Install the terminal cover [8] over the B terminal.
Tighten the bolts [1] while pushing the starter cable (-)
[2] terminal against the projection [3] on the cylinder
block as shown.
Connect the fuse cable 1P connector [1] and set the 1P
connector on the relay bracket [2].
Set the wire harness clip [3] to the neutral switch
bracket [4].
Install the following:
– Fuse box bracket (page 10-4)
– Under cover front bracket (page 6-14)
– R./L. engine under cover (page 6-7)
– Engine cover
– Battery (+) cable and (-) cable
10-10
[2]
[8]
[7]
[5]
[4]
[1]
[6]
[1]
[1]
[3]
[4]
[3]
[6]
[3]
10 – 20 mm
(0.4 – 0.8 in)
[2]
[2]
[1]

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bft 90a

Table of Contents