Starting Procedure After Installing Major Assemblies; Engine Removal/Installation - TOHATSU BFT75A Service Manual

4 stroke outboard motor
Hide thumbs Also See for BFT75A:
Table of Contents

Advertisement

dummyhead
dummyhead
LUBRICATION SYSTEM
STARTING PROCEDURE AFTER
INSTALLING MAJOR ASSEMBLIES
Perform the starting procedure after installing the
following major assemblies.

– Engine removal/installation

– Cylinder head removal/installation
– Oil case removal/installation
Inspect the following and adjust if necessary:
– Shift control cable (page 3-32).
– Throttle control cable/throttle link (page 3-9).
Connect a commercially available digital multimeter or
Dr.H (page 3-20).
Start the engine, raise the engine speed to 2,500 ± 300
min
–1
(rpm), and run it until the oil indicator light (green)
[1] comes on.
SPECIFIED ENGINE SPEED:
2,500 ± 300 min
After the oil indicator light (green) comes on, lower the
engine speed to the idle speed.
IDLE SPEED (AT NEUTRAL):
750 ± 50 min
If the oil indicator light (green) does not come on within
10 seconds after starting the engine, the oil alert system
is activated and the warning buzzer operates.
If that happens, stop the engine and repeat the above
procedure.
If the oil indicator light (green) still does not come on,
perform the alert system troubleshooting (page 4-16)
and repeat the above procedure.
12-4
–1
(rpm)
–1
(rpm)
[1]

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bft 90a

Table of Contents