Toshiba e-STUDIO2500c Service Manual page 300

Multifunctional digital color systems
Hide thumbs Also See for e-STUDIO2500c:
Table of Contents

Advertisement

Notes:
Follow the procedure below for the installa-
tion.
1. When installing, be sure to check if the
TBU separation lever is at the fixed posi-
tion (horizontal position) with the transfer
belt installed.
2. Check if the TBU cleaner pressure hook
is locked. If it is released, rotate the TBU
cleaner pressure hook lever to lock it as
shown in the figure, otherwise the transfer
belt cleaning unit cannot be installed.
3. Insert the A portion of the transfer belt
cleaning unit beneath the stay (B) of the
main frame.
4. Align the portion (C) of the transfer belt
cleaning unit with the portion (D) of the
main frame, then slide the transfer belt
cleaning unit along the stay (B) of the
main frame all the way in.
5. Rotate the lever (sky blue) clockwise to lift
it up until it clicks.
e-STUDIO2500c/3500c/3510c TRANSFER UNIT
Release position
TBU cleanner pressure hook
Fixed position
B
A
13 - 12
Fig. 13-7
D
C
Transfer belt
cleaning unit
Fig. 13-8
May 2006 © TOSHIBA TEC

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-studio3500cE-studio3510c

Table of Contents