Toshiba e-STUDIO2500c Service Manual page 274

Multifunctional digital color systems
Hide thumbs Also See for e-STUDIO2500c:
Table of Contents

Advertisement

[B-4]
EPU PC board (EPU-Y, EPU-M, EPU-C, EPU-K)
The EPU PC boards are installed in the process units (EPU (Y, M, C, K)).
Process unit (EPU (Y)): EPU PC board (EPU-Y)
Process unit (EPU (M)): EPU PC board (EPU-M)
Process unit (EPU (C)): EPU PC board (EPU-C)
Process unit (EPU (K)): EPU PC board (EPU-K)
(1)
Take off the corresponding the process unit
(EPU), and then take off the process cover.
P.11-10 "[A] Process unit (EPU)"
P.11-11 "[B] Process cover"
(2)
Release the latch, and then take off the EPU
connector cover.
(3)
Disconnect the connector.
(4)
Release the latch, and then take off the EPU
PC board.
e-STUDIO2500c/3500c/3510c DEVELOPER UNIT
Latch
EPU
connector cover
Latch
12 - 18
Fig. 12-28
Connector
Fig. 12-29
EPU PC board
Fig. 12-30
May 2006 © TOSHIBA TEC

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-studio3500cE-studio3510c

Table of Contents