Cable Routing Inside The Cabinet; Routing Converter Cables Inside And Outside A Control Cabinet - Siemens SINAMICS G120X Operating Instructions Manual

Infrastructure converter for hvac/water/wastewater
Hide thumbs Also See for SINAMICS G120X:
Table of Contents

Advertisement

Cable routing inside the cabinet

● Route the power cables with a high level of interference so that there is a minimum
clearance of 25 cm to cables with a low level of interference.
If the minimum clearance of 25 cm is not possible, insert separating metal sheets between
the cables with a high level of interference and cables with a low level of interference.
Connect these separating metal sheets to the mounting plate to establish a good electrical
connection.
● Cables with a high level of interference and cables with a low level of interference may only
cross over at right angles:
● Keep all of the cables as short as possible.
● Route all of the cables close to the mounting plates or cabinet frames.
● Route signal and data cables - as well as the associated equipotential bonding cables -
parallel and close to one another.
● Twist incoming and outgoing unshielded individual conductors.
Alternatively, you can route incoming and outgoing conductors in parallel, but close to one
another.
● Ground any unused conductors of signal and data cables at both ends.
● Signal and data cables must only enter the cabinet from one side, e.g. from below.
● Using shielded cables for the following connections:
– Cable between the converter and line filter
– Cable between the converter and output reactor
Figure 3-4
SINAMICS G120X converter
Operating Instructions, 06/2019, FW V1.01, A5E44751209B AC

Routing converter cables inside and outside a control cabinet

3.2 EMC-compliant setup of the machine or plant
Mounting
55

Advertisement

Table of Contents
loading

Table of Contents