Ci Reagent Gas Flow Module - Thermo Scientific TSQ 9000 Hardware Manual

Table of Contents

Advertisement

CI Reagent Gas Flow Module

Thermo Scientific
The CI reagent gas flow module controls the flow of CI reagent gas into the ion source and is
located at the back left of the TSQ 9000 instrument. The module uses electronic pressure
control to precisely set the flow of reagent gas. The flow is programmed using the instrument
control software, which allows you to accurately reproduce flows. To install a new CI reagent
gas flow module:
1. Shut down your system by following the steps in
on
page
127.
2. Remove the four screws securing the left hand front panel to the chassis. One of the
screws is located on the interior front panel of the instrument.
Figure 457. Locating the Left Hand Front Panel Screws
Left Hand Front
Panel
3. Lift the left hand front panel off the instrument.
4. Disconnect the power connections from the left hand sub panel.
"Shutting Down the TSQ 9000 System"
Screws
TSQ 9000 Hardware Manual
4
Upgrade Equipment
CI Reagent Gas Flow Module
Screw on Front
of Instrument
427

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents