Thermo Scientific TSQ 9000 Hardware Manual page 443

Table of Contents

Advertisement

Thermo Scientific
16. Lift the turbomolecular pump up and onto the support clamps.
Note You may need assistance to lift the pump up and onto the clamps. The turbo pump
is large, heavy and awkward to hold with one hand while you are tightening the clamps
with a wrench. If you remove the left hand front panel, control board, lens driver board,
and RF board, it is easier for the other person to hold the pump as you tighten the clamps.
17. Reattach the remaining clamps.
18. Tighten all the bolts holding the turbomolecular pump to the chassis.
19. Attach the adapter to the turbo pump and clamp it in place.
20. Reconnect the turbomolecular pump cable to the distribution board.
21. Reinstall the power module by aligning its connector with the connector on the
distribution board beneath it. Make sure it is flush against the top of the chassis and the
screw holes line up. It will click into place when its in the right position.
22. Reattach the two screws holding the power module to the instrument.
23. Reconnect the power cables on the left side of the instrument. Make sure you attach the
cables properly. The foreline pump connects to the System Mech Pump connector on the
left hand sub panel of the instrument.
24. Replace the right side panel and tighten the five screws.
25. Replace the top cover panel and tighten the screw.
26. Reattach the GC.
27. Restart your system by following the instructions in
3
Advanced Troubleshooting
Replacing the Turbomolecular Pump
"Restarting the System"
on
TSQ 9000 Hardware Manual
page
145.
415

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents