Anode Feedthrough - Thermo Scientific TSQ 9000 Hardware Manual

Table of Contents

Advertisement

Anode Feedthrough

Thermo Scientific
To replace the anode feedthrough, o-ring, four screws, and a standoff:
Note See the ISQ and TSQ GC-MS Spare Parts Guide for information about ordering this
component.
1. Shut down your system by following the steps in
on
page
127.
Note You do not have to remove the ion source cartridge or the column. However, you
must vent the instrument.
2. Slide the top cover panel toward the back of the instrument and lift it off.
3. Disconnect the electrometer board cable and large feedthrough cables labeled Dynode
and Electron Multiplier.
Figure 307. Disconnecting the Electron Multiplier Cables
Electrometer
Board Cable
4. Lift the electrometer shield off the instrument and set it aside.
3
Advanced Troubleshooting
Replacing Components of the Electron Multiplier
"Shutting Down the TSQ 9000 System"
Dynode
Electron
Multiplier
Electron
Multiplier Plate
TSQ 9000 Hardware Manual
283

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents