Thermo Scientific TSQ 9000 Hardware Manual page 403

Table of Contents

Advertisement

Thermo Scientific
29. Reinstall the controller interface board by aligning the two connectors on the bottom of
the board to the connectors on the distribution board beneath it. It will drop into the slot
when it is in the right position.
Figure 399. Reinstalling the Controller Interface Board
30. Push the board down into the connectors.
31. Tighten the screws attached to the support bracket.
32. Reconnect the Ethernet cable to the controller interface board.
33. Reattach the top cover and left hand front panels and tighten the screws. If you are using
hydrogen, reattach the hydrogen safety screws.
34. Restart your system by following the instructions in
Replacing the Calibration Gas Components
Controller
Interface Board
Connectors
"Restarting the System"
3
Advanced Troubleshooting
on
page
145.
TSQ 9000 Hardware Manual
375

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents