A01955
CU DRIVE-CLiQ: Synchronization DO not completed
Message value:
%1
Message class:
Internal (DRIVE-CLiQ) communication error (12)
Drive object:
All objects
Component:
None
Reaction:
NONE
Acknowledge:
NONE
Cause:
After the drive system is switched on, the synchronization between the basic clock cycle, DRIVE-CLiQ clock cycle
and application clock cycle was started but was not completed within the selected time tolerance.
Alarm value (r2124, interpret decimal):
Only for internal Siemens troubleshooting.
Remedy:
Carry out a POWER ON (switch-off/switch-on) for all components of the DO.
A01980
PN: cyclic connection interrupted
Message value:
%1
Message class:
Communication error to the higher-level control system (9)
Drive object:
All objects
Component:
None
Reaction:
NONE
Acknowledge:
NONE
Cause:
The cyclic connection to the PROFINET controller is interrupted.
See also: r8936 (PN cyclic connection state)
Remedy:
Establish the PROFINET connection and activate the PROFINET controller in the cyclic mode.
A01981
PN: Maximum number of controllers exceeded
Message value:
Info. 1: %1, info. 2: %2
Message class:
Error in the parameterization / configuration / commissioning procedure (18)
Drive object:
All objects
Component:
None
Reaction:
NONE
Acknowledge:
NONE
Cause:
A controller attempts to establish a connection to the drive, and as a consequence exceeds the permitted number of
PROFINET connections.
The alarm disappears automatically after approx. 30 seconds.
Alarm value (r2124, interpret hexadecimal):
yyyyxxxx hex: yyyy = info. 1, xxxx = info. 2
Info 1 = 0: number of RT connections exceeded
Info 1 > 0: number of IRT connections exceeded
Info 2: permitted number of connections
Remedy:
Check the configuration of the PROFINET controllers as well as the p8929 setting.
See also: p8929 (PN remote controller number)
A01982
PN: second controller missing
Message value:
-
Message class:
Error in the parameterization / configuration / commissioning procedure (18)
Drive object:
All objects
Component:
None
Reaction:
NONE
Acknowledge:
NONE
Cause:
Connections to two PROFINET controllers are expected. However, only the connection to a PROFINET controller is
present.
- the PROFINET function "Shared Device" is activated (p8929 = 2).
- system redundancy is activated.
Remedy:
Check the configuration of the PROFINET controllers as well as the p8929 setting.
See also: p8929 (PN remote controller number)
SINAMICS G130/G150
List Manual (LH2), 07/2016, A5E03263479A
Propagation:
LOCAL
Propagation:
LOCAL
Propagation:
LOCAL
Propagation:
LOCAL
4 Faults and alarms
4.2 List of faults and alarms
1497

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

SinamicsG150

Table of Contents