-12 VDC Power (IOT LVPS) RAP
This RAP is used to repair short circuits in the -12 VDC Power circuit when directed by another
RAP.
Initial Actions
Use BSD 1.2 in the following procedure:
Procedure
Disconnect
P/J22
from the IOT LVPS and check for -12 VDC at P/J22-4. -12 VDC at P/J22-
4 on the IOT LVPS checked OK.
Y
N
Replace the IOT LVPS
(PL
9.3).
Disconnect the following connectors from their respective PWBs:
P/J395
from the Half Tone PWB
(PL
P/J411
from the IOT Drive PWB
(PL
Reconnect
P/J22
to the IOT LVPS, and check for -12 VDC at P/J22-4. -12 VDC is measured
at P/J22-1.
Y
N
Go to
Flag 7
on BSD 1.2, and check the wires for a short circuit to ground.
Measure for -12 VDC at P/J22-4 after reconnecting P/J395, and
respective PWBs. Note what PWB, if any, loads down the -12 VDC. -12 VDC was OK after
reconnecting
P/J395
to the Half Tone PWB.
Y
N
Perform the following:
Go to Wirenet +12/-12V DC involving the Half Tone PWB and disconnect all compo-
nents from the Half Tone PWB which are supplied with -12 VDC.
Reconnect the components one-by-one to the Half Tone PWB, while checking which
component/circuit loads down the -12 VDC.
Check the wiring to the suspected component for an open/short circuit.
Replace the component, which loads down the -12 VDC.
Perform the following:
Go to Wirenet +12/-12V DC involving the IOT Drive PWB and disconnect all components
from the IOT Drive PWB which are driven by -12 VDC (and not checked earlier in this
RAP).
Reconnect the components one-by-one to the IOT Drive PWB, while checking which com-
ponent/circuit loads down the -12 VDC.
Check the wiring to the suspected component for an open/short circuit.
Replace the component, which loads down the -12 VDC.
Status Indicator RAPs
-12 VDC Power (IOT LVPS) RAP, +13.3 VDC Power
9.2).
9.2).
P/J411
one by one to their

+13.3 VDC Power (IIT/IPS LVPS) RAP

This RAP is used to repair failures in the +13.3 VDC Power (IIT/IPS LVPS) circuit when
directed by another RAP.
Initial Actions
Use BSD 1.3 in the following procedure:
Procedure
Disconnect P/ J5. Go to
Flag 1
on the harness side. ACH is measures between P/ J5-3 and P/ J5-2.
Y
N
Go to the
AC Power
RAP.
Go to
Flag 2
on BSD 1.3. Less than +1 VDC is measured at P/J11A-1.
Y
N
Go to
Flag 3
on BSD 1.3. Less than +1 VDC is measured at P/J11A-13.
Y
N
Perform the following:
Replace the IOT Drive PWB
Replace the IOT CPU PWB
Replace the AC Driver PWB
Go to
Flag 6
on BSD 1.3, and perform the following:
1.
Check the wiring from P/J34 on the IIT/IPS LVPS to the PRE IPS and the CCD for an
open/short circuit.
2.
Replace the IIT/IPS LVPS
3.
Replace the PRE IPS PWB
4.
Replace the IIT Driver PWB
1/05
2-8
manuals4you.com
manuals4you.com
on BSD 1.3, and check for ACH between P/ J5-3 and P/ J5-2
(PL
9.2).
(PL
9.2).
(PL
9.3).
(PL
3.5).
(PL
3.5).
(PL
3.2).