Figure 3 Remove the Screws
5.
Remove the power chassis
(Figure
1. Disconnect the connector.
2. Remove the screws (2).
3. Remove the screws (3).
4. Remove the power chassis.
Repairs and Adjustments
REP 9.3.1
4).
Figure 4 Remove the Power Chassis
Installation
1.
Reinstall the parts in the reverse order of disassembly.
The IOT Control PWB Power Chassis contains the IOT NVM PWB, and the IOT CPU
PWB. Refer to
GP 10 Replacing Billing PWBs
1/05
4-144
manuals4you.com
manuals4you.com
CAUTION
, when replacing this component.
DocuColor 12/DCCS50
Reissue