8.1.2 Steps Before Running

For configuration after wiring, the steps before running are as follows.
1. Power ON
(1) Before turning on the power, please check."7 Power On/Off and" and "8.1.1 Check
Items".
(2) After switching on the power of the control unit, please confirm that the control unit's
PROG. LED (green) is lit.
2. Create the program
(1) Use the tool software to create a program.
(2) Use the "Totally Check Project" of the tool software to check for syntax errors.
3. Confirm the output wiring
Use the mandatory input / output function etc. to check the output wiring.
4. Confirm the input wiring
Check the input wiring through the input display LED or the monitoring function of the tool
software.
5. Test run
(1) Set the mode toggle switch to "RUN" mode, confirm that the "RUN" LED is lit.
(2) Confirm the serial actions.
6. Commissioning
(1) When there is an abnormal action, use the monitoring function of the tool software to
confirm the program's abnormality.
(2) Modify the program.
7. Save the program
Save the program created.