Before Turning On The Power - Panasonic FP-XH M8N16PD User Manual

Programmable controller
Table of Contents

Advertisement

Power On/Off and
Check Items

7.1 Before Turning On the Power

System configuration example
1
4
Power supply
Power supply for I/O
Power supply
AMP
RX
TX
2
 Confirmation matters before the power supply is turned on
No.
Item
Confirm connection of each
device
Confirm the servo amplifier
Confirm the installation of
the safety circuit
Confirm the sequence
setting of turning on the
power supply
Setting of configuration data
Confirmation of mode
switch of the control unit.
Confirm user programs
7-2
5
Over limit
switch
3
Confirmation Contents
Check and ensure that each device has been designed and connected.
Check the wiring of servo amplifier and parameter settings.
Check the connection between the servo amplifier and over limit
switches. Check the installation condition of the over limit switches.
Please verify whether the steps for turning on the power supply are set
according to the requirements of the "Steps for Turning on the Power
Supply".
Check if the parameters and positioning data are configured in the FP-
XH M8N Control Unit as designed.
Set the control unit as PROG. mode. Setting as RUN mode may lead to
neglectful actions.
Create programs to turn off the start request of each operation when
switching the mode to RUN mode. If they are on, they may activate
improperly.
RX
TX
Over limit
switch

Advertisement

Table of Contents
loading

Table of Contents