X9 Maintenance Plug; Power Supply - ABB IRB 6400R Product On-Line Manual

Hide thumbs Also See for IRB 6400R:
Table of Contents

Advertisement

Troubleshooting Tools
D-sub connector
X1
Pin
1
2
3
4
5
6
7
8
9

3.4 X9 Maintenance plug

3.4.1 Power supply

Supply voltages can be measured at the following points:
X9
Pin
28
29
30
31
32
There is a 10 kΩ resistor between each power supply line and the test terminal to pre-
vent damage by a short circuit.
ACOK: Follows the AC power input without delay. High (= 5V) when power is OK.
DCOK: Follows the supply unit energy buffer. After power on, DCOK goes high (=5
V) when output voltages are stable.
34
Signal
RXD
TXD
DTR
0 V
DSR
RTS N
CTS N
Row A
ACOK
+ 5V_TST
+ 15V_TST
15V_TST
+ 24V_TST
X2
Pin
Signal
1
TXD
2
TXD N
3
RXD
4
RXD N
5
0 V
6
DATA
7
DATA N
8
DCLK
9
DCLK N
Row C
DCOK
0V
0V
0V
0V
Product Manual

Advertisement

Table of Contents
loading

Table of Contents