ZyXEL Communications MSC1000G User Manual page 281

Management switch card
Hide thumbs Also See for MSC1000G:
Table of Contents

Advertisement

Select the ports to be used by the DSL line group and click Apply. Ports may not be shared
6
between line groups. For example, if port 1 belongs to "Group1", it may not belong to "Group2".
• G.bond on ADSL and the VLC14xx lines only supports pairs of ports (1, 2), (3, 4) and so on.
• G.bond on SHDSL lines set to ATM mode supports multiple ports (up to 16).
• G.bond on SHDSL lines set to EFM mode supports PAF bundling for groups of 2 to 4 ports.
Members of a bonding group must be in the same DSL phy. Each DSL phy consists of 4
consecutive ports, so ports 1~4 are a phy, ports 5~8 are a second phy, 9~12 are a third, and
so on. You can bond any combination of ports 1, 2, 3, and 4 but that group cannot include any
of the other ports. You could also bond any combination of ports 5, 6, 7, and 8 but not any of
the other ports. So for example you could bond ports 1, 3, and 4 but you could not include
ports 5 or higher.
• G.bond on the VLC1324G-51/53 and VLC1348G-51/53 supports these port pairs:
1.)
2,3
2.)
5,6
3.)
8,9
4.)
11,12
5.)
14,15
6.)
17,18
7.)
20,21
8.)
23,24
9.)
26,27
10.) 29,30
11.) 32,33
12.) 35,36
13.) 38,39
14.) 41,42
15.) 44,45
16.) 47,48
Click Apply in the Port > G.bond screen to complete setup of the G.bond settings.
7
2.
The ALC1372G-51 supports G.bond on pairs of ports (1, 2) and (3, 4) and so on except ports (11,12), (25,26), (47,48) and
(61,62).
Management Switch Card User's Guide
Chapter 9 Subscriber Port Setup Screens
2
281

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Msc1024gMsc1224gMsc1024gbMsc1024gcMsc1224gb

Table of Contents