Got Connection; Outline; Enabling Conditions; Connectable Got Models - Mitsubishi Electric M800VW Series Programming Manual

Plc programming
Hide thumbs Also See for M800VW Series:
Table of Contents

Advertisement

M800V/M80V Series PLC Programming Manual (2/2)
14 PLC Help Function

14.24 GOT Connection

14.24 GOT Connection

14.24.1 Outline

This function connects and communicates between Mitsubishi Electric general graphic operation terminal (GOT) and
Mitsubishi Electric CNC.
Only GOT2000 series can be connected. Soft GOT 2000 can be connected, too.
There are two connection methods for GOT connection, Ethernet connection and CC-Link connection.
For details, refer to "M800/M80 Series GOT Connection Specifications manual (BNP-C3072-314)".
Operation and monitoring from GOT to PLC device of the NC can be performed, and GOT can be used as a sub monitor of
peripheral operation panel or NC operation panel.
M8V series

14.24.2 Enabling Conditions

To use GOT connection function, the NC parameter setting is required.
When using Ethernet connection
Use SLMP server function of NC to connect.
Set the parameter "#1489 SLMP_on" to "1" and then restart the unit.
After restarted, SLMP server function is valid. When SLMP server function is invalid, the connection between NC and GOT
cannot be performed.
When using CC-Link communication function
Set "CC-Linkparam 1" and "CC-Linkparam 2" properly and then restart the unit.
After restarted, the parameter setting is reflected.

14.24.3 Connectable GOT Models

Connectable GOT models are as follows.
Connection method
Ethernet connection
SLMP
CC-Link connection
CC-Link
(*1) For devices which can use Ethernet connection and have SLMP client function only.
(*2) CC-Link connection unit needs to be mounted.
Operation of PLC device
Monitoring PLC device
Connection protocol
GT21, GT25, GT27, SoftGOT2000 (*1)
GT25, GT27 (*2)
GOT2000 series
Connectable model
719
IB-1501668-B

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents