Estimated Processing Time - Mitsubishi Electric M800VW Series Programming Manual

Plc programming
Hide thumbs Also See for M800VW Series:
Table of Contents

Advertisement

M800V/M80V Series PLC Programming Manual (2/2)
14 PLC Help Function
14.8 High-Speed Simple Program Check

14.8.3 Estimated Processing Time

The estimated processing time for processing programs during the high-speed simple program check is output to the time
measurement output registers (R372 and R373).
The unit of measurement for the estimated processing time is [ms].
The estimated processing time is the time from the start of program operation until the operation ends due to an NC reset of
all part systems. (Refer to the following figure.)
The estimated processing time is calculated and output with the execution time during actual operation regardless of the
setting of the time reduction coefficient (R378).
The estimated processing time will result in error for programs that operate with single operation mode turned ON.
Turn OFF single operation mode when measuring the estimated processing time.
Actual run time
(Part system 1)
Actual run time
(Part system 2)
Actual run time according to
high-speed simple program
check (e.g. 1/4)
Estimated output processing
time [ms]
Conversion to normal operation time
599
IB-1501668-B

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents