Installing The Ptx5000 Cable Management System For A High Capacity Dc Pdu; Identifying The Parts Of The Cable Management System - Juniper PTX5000 Hardware Manual

Packet transport router
Hide thumbs Also See for PTX5000:
Table of Contents

Advertisement

CAUTION: You must use an appropriate torque-controlled tool to tighten the nuts.
Applying excessive torque damages the terminal studs. The maximum torque that may
be applied to this nut is 62 lb-in. (7 Nm).
• Phillips (+) screwdriver, number 2
• DC power cables, which you must provide
• DC power lugs
Installing the PTX5000 Cable Management System for a High Capacity
DC PDU
IN THIS SECTION

Identifying the Parts of the Cable Management System | 256

Installing the Cable Management Comb Assembly with Extension | 257
Widening the Cable Management Comb Assembly Extension | 260
Installing the Cable Management Comb Assembly Without Extension | 261
Identifying the Parts of the Cable Management System
NOTE: You cannot install this cable management system on a two-post rack.
1. Remove the cable management system parts from the accessories kit in the shipping crate.
2. Identify all the parts of the cable management system.
• Two comb panel assemblies—the comb assembly, fixed to the extension panel with four screws, is
detachable. See
Figure 1
for left and right side views of the cable manager.
256

Advertisement

Table of Contents
loading

Table of Contents