Replacing A Ptx5000 Centralized Clock Generator; Removing A Centralized Clock Generator - Juniper PTX5000 Hardware Manual

Packet transport router
Hide thumbs Also See for PTX5000:
Table of Contents

Advertisement

Action | 316
Purpose
For optimum performance, verify the condition of the CCGs.
Action
On a regular basis:
• Check the CCG LEDs. For more information, see
page
30.
During normal operations:
• The green OK LED on the CCG faceplate is lit.
• The yellow FAIL LED on the CCG faceplate is not lit.
• Issue the show chassis environment ccg command to display information about the CCGs.

Replacing a PTX5000 Centralized Clock Generator

IN THIS SECTION

Removing a Centralized Clock Generator | 316

Installing a Centralized Clock Generator | 317
Removing a Centralized Clock Generator
The PTX5000 can have one or two CCGs installed. The CCGs are located in the upper rear of the
chassis, above the Control Boards and Routing Engines. Each CCG weighs approximately 1.9 lb (0.9 kg).
A nonredundant CCG is hot-pluggable. For redundant CCGs, the primary CCG is hot-pluggable. The
backup CCG is hot-removable and hot-insertable if the primary CCG is functioning. Removing the
"PTX5000 Centralized Clock Generator LEDs" on