Maintaining The Ptx5000 Ac Power System - Juniper PTX5000 Hardware Manual

Packet transport router
Hide thumbs Also See for PTX5000:
Table of Contents

Advertisement

Maintaining the PTX5000 AC Power System

IN THIS SECTION
Maintaining the PTX5000 AC Power System | 345
Replacing a PTX5000 Three-Phase Delta AC PDU | 348
Replacing a PTX5000 Three-Phase Delta AC PDU Power Cord | 359
Replacing a PTX5000 Three-Phase Wye AC PDU | 366
Replacing a PTX5000 Three-Phase Wye AC PDU Power Cord | 378
Replacing a PTX5000 Normal-Capacity AC PSM | 384
Replacing a PTX5000 High Capacity Delta AC PDU | 386
Replacing a PTX5000 High Capacity Wye AC PDU | 394
Replacing a PTX5000 High Capacity Single-Phase AC PDU | 403
Replacing a PTX5000 High Capacity AC PSM | 414
Maintaining the PTX5000 AC Power System
IN THIS SECTION
Purpose | 345
Action | 345
Purpose
For optimum performance, verify the condition of the power distribution units (PDUs), power supply
modules (PSMs), AC power cords, and grounding cables.
Action
On a regular basis:
345

Advertisement

Table of Contents
loading

Table of Contents