Juniper PTX5000 Hardware Manual page 568

Packet transport router
Hide thumbs Also See for PTX5000:
Table of Contents

Advertisement

11. Install the new SIB:
Figure 288: Installing a SIB into the PTX5000
a. Attach an ESD grounding strap to your bare wrist, and connect the strap to one of the ESD
points on the chassis.
b. Place one hand underneath the SIB to support it. With the other hand, hold one of the ejector
handles on the SIB faceplate.
c. Carefully align the sides of the SIB with the guides inside the chassis.
d. Slide the SIB into the chassis, carefully ensuring that it is correctly aligned.
e. Twist the ejector handles clockwise until they stop.
12. Bring the new SIB online by using the request chassis sib online slot
13. When the new SIB is online, check for any link errors or traffic drops with the following commands:
• show chassis alarms—Ensure there are no active alarms.
• show chassis sibs —The value of the state field should be Online, indicating that the SIBs are
operational and running.
• show interfaces statistics and show pfe statistics traffic—Ensure that there are no traffic drops.
slot-number command.
550

Advertisement

Table of Contents
loading

Table of Contents