Powering Off The Ptx5000; Powering Off A Ptx5000 With Re-Duo-C2600-16G Routing Engines - Juniper PTX5000 Hardware Manual

Packet transport router
Hide thumbs Also See for PTX5000:
Table of Contents

Advertisement

NOTE: After a PDU is powered on, it can take up to 60 seconds for status indicators—such
as the LEDs on the PDU and PSMs, the command output displays, and messages on the
LCD display on the craft interface—to indicate that the PDU and PSMs are functioning
normally. Ignore error indicators that appear during the first 60 seconds.
NOTE: If the PDU OK and PSM LEDs do not light steadily or if the fault
(
) LED on the PSM is lit, see
PTX5000 Packet Transport Router Hardware Guide
the
9.
On the external management device connected to the Routing Engine, monitor the startup process
to verify that the system has booted properly.
10. Repeat Step
6
through Step
NOTE: The Routing Engine boots as the PDU completes its startup sequence. If the Routing
Engine finishes booting and you need to power off the system, see the
PTX5000" on page 299
After powering on a power supply, you must wait at least 60 seconds before powering it off.

Powering Off the PTX5000

IN THIS SECTION

Powering Off a PTX5000 with RE-DUO-C2600-16G Routing Engines | 299

Powering Off a PTX5000 with RE-PTX-X8-64G Routing Engines | 301
Powering Off a PTX5000 with RE-DUO-C2600-16G Routing Engines
To power off a PTX5000 with RE-DUO-C2600-16G Routing Engines:
"Troubleshooting the PTX5000 Power System" on page 591
8
for the other PDU.
in the
PTX5000 Packet Transport Router Hardware Guide
.
"Powering Off the
.
299