ABB IRB 920 Product Manual page 98

Hide thumbs Also See for IRB 920:
Table of Contents

Advertisement

4 Maintenance
4.4.4 Inspecting axis-3 mechanical stops
Continued
Required tools and equipment
Visual inspection, no tools are required.
Other tools and procedures may be required if the spare part needs to be replaced.
These are specified in the replacement procedure.
Inspecting, axis-3 mechanical stops
Use this procedure to inspect mechanical stops on axes 1 and 2.
1
2
Continues on next page
98
Note
For robots with protection type Clean Room
For robots with protection class IP54
First remove the upper bellow and lower bellow according to
bellows on page
421.
Then, use this procedure to inspect the ball screw spline unit.
Action
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot working area.
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the paint
edge when disassembling parts of the robot! See
Cut the paint or surface on the robot before repla-
cing parts on page
118.
© Copyright 2022 ABB. All rights reserved.
Replacing the
Information
Product manual - IRB 920
3HAC075721-001 Revision: C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 920 seriesIrb 920-6/0.55Irb 920-6/0.65Irb 920t-6/0.45Irb 920t-6/0.55Irb 920t-6/0.65

Table of Contents