ABB IRB 920 Product Manual page 694

Hide thumbs Also See for IRB 920:
Table of Contents

Advertisement

5 Repair
5.6.11 Replacing the outer arm
Continued
8
9
10
Refitting the cable ferrule and bracket in the outer arm
1
2
3
Continues on next page
694
Action
Use a sonic tension meter to measure the timing
belt tension.
If the timing belt tension does not meet the require-
ment, loosen the motor screws and readjust.
Refit the pulley protection cover and secure with
screws.
Action
For robots with protection type Clean Room:
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free. See
Cut the paint or surface on the robot
before replacing parts on page 118
Note
After all repair work, wipe the Clean Room robot
free from particles with spirit on a lint free cloth.
Lay the internal harness in a natural state without
distortion.
Refit the cable ferrule and secure it with the
screws.
Tip
The air hoses should face the process hub side.
Tip
The position with wrapped tape is the marked
position for the cable ferrule.
Tip
Align all the cable ferrules so that the cable is in
a natural bending position to avoid twisting.
© Copyright 2022 ABB. All rights reserved.
Note
Used belt: 315
New belt:260
Screws: Hex socket head cap
screw M4x10 12.9 Lafre
2C2B/FC6.9 (3 pcs)
Tightening torque: 0.8 Nm
xx2100001047
Note
Screws: Hex socket head cap
screw M3x8 12.9 Lafre 2C2B/FC6.9
(2 pcs)
Tightening torque: 1.2 Nm ±10%
xx1800002849
Product manual - IRB 920
3HAC075721-001 Revision: C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 920 seriesIrb 920-6/0.55Irb 920-6/0.65Irb 920t-6/0.45Irb 920t-6/0.55Irb 920t-6/0.65

Table of Contents