ABB IRB 920 Product Manual page 610

Hide thumbs Also See for IRB 920:
Table of Contents

Advertisement

5 Repair
5.6.9 Replacing the axis-4 timing belt
Continued
Removing the axis-4 second timing belt
1
2
3
4
Removing the axis-4 timing belt
1
Continues on next page
610
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
replacing parts on page
118.
Remove the screws and washers on the transmis-
sion module flange to let the axis-4 second timing
belt be free.
Remove the timing belt.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
© Copyright 2022 ABB. All rights reserved.
Note
xx2100001092
xx2100001093
Note
Product manual - IRB 920
3HAC075721-001 Revision: C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 920 seriesIrb 920-6/0.55Irb 920-6/0.65Irb 920t-6/0.45Irb 920t-6/0.55Irb 920t-6/0.65

Table of Contents