ABB IRB 920 Product Manual page 745

Hide thumbs Also See for IRB 920:
Table of Contents

Advertisement

2
3
Reconnecting the connectors for axis-1 motor
1
2
Product manual - IRB 920
3HAC075721-001 Revision: C
Action
Insert the internal harness into the outer arm
through the plastic protection tube and the centre
of the axis-2 gearbox.
Tip
Wrap the connectors with the masking tape.
Secure the R2.MP3 and R2.MP4 with cable straps.
Action
For robots with protection type Clean Room:
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free. See
Cut the paint or surface on the robot
before replacing parts on page 118
Note
After all repair work, wipe the Clean Room robot
free from particles with spirit on a lint free cloth.
Insert the female head of the connectors to the
bracket accordingly.
Tip
The mistake proofing measure has been applied
to the connectors, the connectors may be dam-
aged if excessive force is used.
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
© Copyright 2022 ABB. All rights reserved.
5.7.1 Replacing the axis-1 motor sub-assembly
Note
For rear outlet cable version:
xx2100000955
For undeneath outlet cable version:
xx2100001206
Note
xx2100000950
5 Repair
Continued
Continues on next page
745

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 920 seriesIrb 920-6/0.55Irb 920-6/0.65Irb 920t-6/0.45Irb 920t-6/0.55Irb 920t-6/0.65

Table of Contents