ABB IRB 920 Product Manual page 604

Hide thumbs Also See for IRB 920:
Table of Contents

Advertisement

5 Repair
5.6.9 Replacing the axis-4 timing belt
Continued
2
3
4
For Clean Room/ IP54 robots
Removing the top cover and the flange with bearing
1
Continues on next page
604
Action
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
replacing parts on page
118.
Remove the screws on the process hub.
Note
For robots with protection class IP54 (option 3350-
540)
For robots with protection type Clean Room (op-
tion 3351-1)
Remove the screws on the process hub and take
out the gasket.
Tip
Check the gasket and replace it if needed.
Insert the process hub to the outer arm.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
© Copyright 2022 ABB. All rights reserved.
Note
For robots with protection class
IP30
xx2100000932
For robots with protection class
IP54 (option 3350-540)
For robots with protection type
Clean Room (option 3351-1)
xx2100000932
Note
Product manual - IRB 920
3HAC075721-001 Revision: C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 920 seriesIrb 920-6/0.55Irb 920-6/0.65Irb 920t-6/0.45Irb 920t-6/0.55Irb 920t-6/0.65

Table of Contents