ABB IRB 920 Product Manual page 876

Hide thumbs Also See for IRB 920:
Table of Contents

Advertisement

5 Repair
5.8.1 Replacing the axis-1 gear unit sub-assembly
Continued
3
4
5
6
Continues on next page
876
Action
Refit the motor and refit the timing belt to the
motor.
Ensure that the belt runs correctly in the grooves.
Refit the screws and washers without fully
tightened.
Hang a strap to the hook on the motor.
Use a handheld dynamometer hooking to the strap
and pull the dynamometer to make the tension
falling in the allowed force range.
Note
During the measurement, make sure that all inter-
ferences that may affect the force are removed.
Pay attention to the force application direction.
© Copyright 2022 ABB. All rights reserved.
Note
Screws: Hex socket head cap
screw M4x16 12.9 Lafre
2C2B/FC6.9 (3 pcs)
Washers: Plain washer machining
4.2x9x2 steel (3 pcs)
Tightening torque: 2.8 Nm ±10%
xx2100001038
Timing belt A1:
3HAC070449-001
Used belt: 51.1
New belt:90
xx2100001043
Product manual - IRB 920
3HAC075721-001 Revision: C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 920 seriesIrb 920-6/0.55Irb 920-6/0.65Irb 920t-6/0.45Irb 920t-6/0.55Irb 920t-6/0.65

Table of Contents